UK’s most polluting power plant could power country’s largest AI datacentre

Drax’s FTSE 250 owner strikes £20bn deal to build infrastructure in what it says is site’s ‘next chapter’
Britain’s most polluting power plant could soon power the country’s largest datacentre under a £20bn deal to build AI infrastructure on the site of the Drax power plant in North Yorkshire.
The power plant’s FTSE 250 owner has struck a deal with the infrastructure investor Brookfield and and the AI infrastructure platform Radiant to develop a datacentre with an eventual capacity of more than 1 gigawatt that could begin operations by early 2028.
In the initial phase of the project Drax will provide the datacentre project with land and access to the national power grid through existing connections on the site, but it hopes to begin powering the datacentre directly by the…
Kutipan awal dari The Guardian Business, ditulis oleh Jillian Ambrose. Hak cipta artikel milik penerbit.



